One of the stages that most concern many of us is the stage of implementing interior decoration projects (Fit Out Works). Often while finishing you don’t know where to start. We at Grundstein Interior Design and Decoration follow different strategies to implement projects depending on the schedule, nature of the project, location and many other factors that have a direct and sometimes indirect impact on the way the project is implemented

Therefore, the Grundstein implementation team has taken some basic steps that are almost fixed in the implementation process, and we show you some of them:

The finishing process in the Grundstein company is carried out on 12 basic stages, which are worked on stage after stage or in parallel, and the stages in order are:

  1. Electricity works.
  2. Plumbing work.
  3. Carpentry.
  4. Conch business.
  5. Isolation works.
  6. Flooring works.
  7. Ceilings and gypsum works.
  8. House painter.
  9. Electrical Finish Works.
  10. Finish Plumbing.
  11. Gas installation.
  12. Doors and windows.
  13. Electricity works.

In the electrical supply business, the Grundstein team does the following:

  • Digging paths in the walls and ceilings according to the engineering drawing and identifying all the electricity points that need to be fed.
  • Determining the location of the meter outside the house and the location of the switchboard, which is inside the apartment, in addition to the locations of the frames and electrical switches for each room.
  • Locating chandeliers and fixed lighting units.
  • Throwing hoses in the previous crushing places and fixing them with gravel and mortar.
  • Install the magic cans in the walls with a clamshell work around the cans, taking into account that the cans are not submerged inside the wall and not protruding too much.
  • Taming wires inside hoses in walls and ceilings.
  • Installing the lamps in their places at a rate of 2-4 in all rooms and in the reception, kitchen and bathroom to operate the necessary devices, taking into account adding the shower, telephone or internet connections in addition to the air conditioning connections, and finally the light switches according to each room and its use.
  • Make sure that the materials are of high quality to ensure the safety and security of family members.

plumbing work

One of the most important works that must be paid attention to during the implementation of decoration projects (Fit Out Works), because it affects the building as a whole in the event of any water leakage from any part of the plumbing. Therefore, we at Grundstein Interior Design and the implementation of decoration take into account many things, including:

  • Determining the sanitary locations for the base of the bathroom, sink and bathtub/jacuzzi in each bathroom in addition to the location of the sink in the kitchen and locating the drain location of the washing machine and dishwasher, taking into account the installation of a service tap for the necessities.
  • Digging the feeding and drainage pipe paths in the walls and floors according to the specified places.
  • Making extensions inside the toilets and connecting a feeding line from the roof to each bathroom or kitchen separately.
  • Installing pipes using mortar.
  • Extension of the sewage and sewage network.
  • The presence of tendencies in the drain pipes must be taken into account to allow effective drainage.
  • Determining the places to exchange the adaptations, provided that they are separate from the bathrooms.
  • It is taken into account to postpone the purchase of bathroom finishing materials for the last stages and after finishing paints and floors so that they are not subject to breakage or damage.

Carpentry

Here lies the craftsmanship, quality and high technology, so we at Grundstein take great care when implementing decoration projects(Fit Out Works) in this detail, as our team:

  • Installing sapphire rings on doors, windows and balconies, even if they are aluminum
  • Installation of wooden door frames and others, provided that the installation of the doors is postponed after the completion of the clamshell.
  • Remove the doors that you need at this stage, such as the main door, noting leaving 10-15 cm, which will be the value of the height of the ceramic or tile.
  • Installing a gallon for the main apartment door to ensure the security of the apartment and save any supplies or materials in the finishing stages.

oyster business

One of the most important items for the implementation of decoration projects (Fit Out Works) because of its impact on the quality of the final paint work, attention must be paid to the cleanliness of the site and the quality of the oyster, and this is what we do at Grundstein Interior Design and Decoration.

  • The necessary materials must be prepared in one batch of sand, cement and gypsum
  • If you install doors, remove and store them so they are not damaged by cement, mortar, and water.
  • The wall is divided by bulges and strings, and each space is puzzled separately.
  • Making a splash for the walls to contribute to the installation of gypsum cornices, as well as fixing the final paints.
  • Pay attention to the corners and seal around the door rings, above the electrical hoses, and around the electrical boxes.
  • It is taken into account to spray water on the layers of oysters for a period of not less than 7 consecutive days, which contributes to increasing the cohesion and hardness of the oysters.
  • The flatness of the oyster layer is tested by pulling a string at different points on each wall or using a water balance.
  • After finishing the cladding of the walls, the cladding of the ceilings and cornices is started, using another industrialist for gypsum work.

Isolation works

One of the most important works that contributes to protecting walls and ceilings from water leakage in kitchens and bathrooms. Attention should be paid to this stage, as its problems are complicated in the future on walls and ceilings.

isolation steps

  • Begin by cleaning the bathrooms thoroughly before doing the bathroom insulation.
  • Insulation shall be carried out with bitumen coils, hot assums, or paint-cement insulation, two perpendicular or both.
  • The neck of the bottle at the junction between the walls and floors should be made of cement.
  • It is important to test the insulation by placing water in the bathroom and leaving it for 48 hours while monitoring the rate of deficiency.
  • If the water level decrease is significant, this is an indication of insulation leakage. The external walls of the bathrooms and the ceiling of the basement must be monitored for traces of water. If traces of water are found, it is necessary to re-insulate again and re-test accordingly.
  • After receiving the insulation, a light protective layer of concrete is applied to the insulation.

flooring work

One of the easiest items to implement, but the most expensive

Floor finishing materials are sand, black cement and white cement sack.

You must make sure to distinguish